Repairs to infrastructure in the Pyrenees Shire

2022.10.07 - Lexton YalongF1-1.jpg

Update 3 April 2025

Council has completed putting together packages of work to finish the repairs to infrastructure that was flood damaged.  It's great news that on the ground works have re-commenced as reimbursement approval has been provided by the State Government to go ahead with each package of work.   

Repair works such as debris removal, culvert cleaning, and scour repairs have commenced in the Snake Valley and South of Beaufort area and also around Amphitheatre and Mount Lonarch. These works may seem small, however the repairs are important for the continued function of the road network and drainage infrastructure.

Works were recently completed on the following roads:

Costers Road (Chepstowe)
Linton Mortchup Road (Linton)
McIntosh’s Lane (Snake Valley)
Waldrons Road (Middle Creek)
Listons Road (Middle Creek)
Greenhill Creek Road (Amphitheatre)
Cowans Lane (Amphitheatre)
Wills Road (Carranballac)
B
allyrogan Road (Buangor)
Stockyard Hill Road (Beaufort)


Further repair works are about to commence on:

Lower Wimmera Road (Glenlogie)
Amphitheatre Road (Amphitheatre)
Mountain Hut Road (Amphitheatre)
Fortes Road (Chute)
The Glut Road (Raglan); and many others.

 

Other packages of work that has been approved:   

· Bridges in Glenpatrick, Amphitheatre, Elmhurst, Redbank, Mt Emu, and Beaufort
· Culverts in Snake Valley, Lexton and Beaufort
· Floodway in Lexton
· Bridge over Lower Wimmera River
· Replacement of guardrail
· Other works in Landsborough, Homebush, Avoca, Hopes Lane and Hillman Road




Completed Works (before and after photos)

Lexton Ararat Road (Lexton) - flood debris removal

Lexton-Ararat-Road-before.jpg   Lexton-Ararat-Road-after.jpg


Costers Road (Chepstowe) - erosion repair

Costers-Road-before.jpg   Costers-Road-after.png

 

Greenhill Creek Road (Amphitheatre) - culvert clearing

Greenhill-Creek-Road-before.jpg  Greenhill-Creek-Road-after.jpg

 

Cowans Lane (Amphitheatre) - floodway repair

Cowans-Lane-before.jpg  Cowans-Lane-after.jpg

 

Moonambel Natte Yallock Road in Natte Yallock

2024.02.05-Moonambel-Natte-Road-before.jpg  2024.02.05-Moonambel-Natte-Road-completed.jpg

Avoca Lions Park

Avoca-Lions-Park-Wall-before.png   Screenshot-2023-12-20-082742.png  

2022.10.18-Lions-Park-Avoca-Table-30-before.jpeg  Avoca-Lions-Park-Table-after.jpeg

Avoca Skate Park

2023.11.21-Avoca-Skate-Park-before.jpg  Screenshot-2023-12-20-082639.png  

Beaufort Scout/Guide Hall

Beaufort-Scout-Guide-Hall-Air-Cons.jpg  2023.12.12-Beaufort-Scout.Guide-Hall.jpg

Repair scours on Pittong Snake Valley Road, Snake Valley

2023.11.23-Pittong-Snake-Valley-Rd-Snake-Valley-before.jpeg  2023.11.23-Pittong-Snake-Valley-Road-Snake-Valley-after.jpeg

Repair scours on Ellis Road, Beaufort

2023.11.27-Ellis-Road-Beaufort-before.jpeg  2023.11.27-Ellis-Road-Beaufort-after.jpeg

Repair scours and potholes on Cheesemans Road, Beaufort

2023.11.21-Cheesemans-Road-Beaufort-before.jpeg  2023.11.21-Cheesemans-Road-Beaufort-after.jpeg

Footbridge - Mountain Creek Road, Moonambel

Footbridge-Mountain-Creek-Rd-Moonambel-before.jpeg  Footbridge-Mountain-Creek-Rd-Moonambel-after.jpeg

Culvert works on Cains Road, Natte Yallock

2023.08.03-Cains-Road-Natte-Yallock-culvert-before.jpeg 2023.08.03-Cains-Road-Natte-Yallock-culvert-after.jpeg

Road works on Easter Brooks Lane, Elmhurst

2023.07.29-Easter-Brooks-Lane-Elmhurst-before.jpeg  2023.07.29-Easter-Brooks-Lane-Elmhurst-after.jpeg

Road works on North South Road, Chepstowe

2023.06.28-North-South-Road-Chepstowe-beifore.jpeg  2023.06.28-North-South-Road-Chepstowe-after.jpeg

Road works on Reservoir Road, Smythesdale

2023.08.03-Reservoir-Rd-Smythesdale-before.jpeg  2023.08.03-Reservoir-Rd-Smythesdale-after.jpeg

Gravel road works on School Road, Waterloo

2023.07.03-School-Road-Waterloo-before.jpg  2023.07.03-School-Road-Waterloo-after.jpg

Finch Lane, Waterloo

2023.07.06-Finch-Lane-Waterloo-Before.jpg  2023.07.06-Finch-Lane-Waterloo-After.jpg

Clean up and repair of Avoca Men's Shed

2022.10.18-Avoca-Mens-Shed-18.jpg  2022.10.18-Avoca-Mens-Shed-22.jpg

2023.06.20-Avoca-Mens-Shed.jpg  2023.06.20-Avoca-Mens-Shed1.jpg

 

Major culvert works on Old Shirley Road, Beaufort

2023.06.17-Old-Shirley-Rd-Culvert-before-2.jpeg  2023.06.17-Old-Shirley-Rd-Culvert-before-1.jpeg

2023.06.17-Old-Shirley-Rd-Culvert-Complete.jpeg  2023.06.17-Old-Shirley-Rd-Culvert-Complete1.jpeg

Shoulder works on Old Shirley Road, Beaufort

2023.05.26-Old-Shirley-Rd-before.jpeg  2023.05.26-Old-Shirley-Rd-completed.jpeg  

Major culvert on High Street, Redbank

2023.06.02-High-St-Redbank-before1.jpeg  2023.06.02-High-St-Redbank-completed.jpeg

Damaged gravel on Barkly Navarre Road

Barkly-Navarre-Road-damaged-gravel-before1.jpeg  2023.05.24-Barkly-Navarre-Road-damaged-gravel-complete.jpeg

Shoulder work on Beaufort-Waubra Road 

Beaufort-Waubra-Rd-Waubra-before1.jpeg  2023.05.16-Beaufort-Waubra-Road-completed_1.jpeg

Shoulder work on Ralstons Lane in Waubra (cnr Beaufort Waubra Rd)

Ralsons-La-Waubra-before1.jpeg   2023.05.08-Ralstons-Lane-Waubra-completed_1.jpeg

Pavement works over the Trawalla Creek culvert on Back Waterloo Road

2023.05.18-Back-Waterloo-Road-damaged.jpg  2023.5.18-Back-Waterloo-Road-completed.jpg


Clean-up work on Greenhill Creek Road bridge in Amphitheatre is complete. 
The bridge approach work is currently being designed.

Greenhill-Creek-Rd-Amphi-before1.jpeg  Greenhill-Creek-Rd-Amphi-after1.jpeg

Shoulder work on Stud Farm Road in Waubra

Stud-Farm-Rd-Waubra-before1.jpeg  Stud-Farm-Rd-Waubra-after1.jpeg

 

Examples of the severe road damage can be viewed in our image gallery below.